LONG BEACH FISCAL MAPComplete overview + physical-site detail · FY2025 v4.1
Lifecycle controls reconciled87,484 physical sites
URBAN3-STYLE FISCAL SKYLINE

Annual revenue versus the infrastructure required to serve each place.

The citywide view sums every site into complete 250-meter cells instead of sampling outliers. A ±$500-per-site annual materiality band keeps near-break-even properties neutral instead of creating a red-green checkerboard.

Mapped City revenue$299M
Annual road lifecycle$279M
Utility infrastructure$91M
Building the Long Beach lifecycle skylineLoading complete overview coverage
Complete 250 m overview · zoom in for sitesDrag to pan · Control/right-drag to rotate · connecting sites
Tax-supported lifecycle net / acre
-$18,936neutral ±$500/site$85,192
All sites aggregated—not an outlier sample · selected balance $18M
WHAT V4 CORRECTS

The overview now shows the city pattern—not a selection of parcel outliers.

Download v4.1 site data
01ASSESSMENT RECORDS

One APN is counted once

Repeated geometry pieces are dissolved by APN before tax or assessed value is placed. Stacked components are then combined into physical sites.

107,622 shapes → 107,365 assessments → 87,484 sites
02ACCESS + MOBILITY

Arterials are not a neighbor's private road

Local access follows frontage by street class. The rest of the full-network lifecycle reserve is shared by modeled service demand.

$116M local · $163M shared
03COMPLETE OVERVIEW

No low-zoom outlier sampling

Every site ledger is summed into 250-meter cells at city scale. Zoom 13 reveals the underlying sites, including explicit warnings on published sliver geometry.

1,988 cells · 121 cautioned sites
Primary public sourcesAll street segments 2025 PCI memo Access vs mobility Utilities FY2025 Utility bill split Model lb-fiscal-productivity-v4.1.0 · SHA a3c0f45222dd